Share
Planning for a project using GERT
Rohit Bajaj
(Author)
·
Lokesh Pawar
(Author)
·
LAP Lambert Academic Publishing
· Paperback
Planning for a project using GERT - Bajaj, Rohit ; Pawar, Lokesh
Choose the list to add your product or create one New List
✓ Product added successfully to the Wishlist.
Go to My Wishlists
Origin: U.S.A.
(Import costs included in the price)
It will be shipped from our warehouse between
Monday, July 29 and
Monday, August 05.
You will receive it anywhere in United Kingdom between 1 and 3 business days after shipment.
Synopsis "Planning for a project using GERT"
GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates.
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
All books in our catalog are Original.
The book is written in English.
The binding of this edition is Paperback.
✓ Producto agregado correctamente al carro, Ir a Pagar.