Share
project scheduling with time windows and scarce resources
Klaus Neumann
(Author)
·
Christoph Schwindt
(Author)
·
Jürgen Zimmermann
(Author)
·
Springer
· Paperback
project scheduling with time windows and scarce resources - Neumann, Klaus ; Schwindt, Christoph ; Zimmermann, Jürgen
£ 130.50
£ 145.00
You save: £ 14.50
Choose the list to add your product or create one New List
✓ Product added successfully to the Wishlist.
Go to My WishlistsIt will be shipped from our warehouse between
Friday, August 02 and
Tuesday, August 06.
You will receive it anywhere in United Kingdom between 1 and 3 business days after shipment.
Synopsis "project scheduling with time windows and scarce resources"
A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice - are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing efficient exact and heuristic solution methods. New interesting applications of project scheduling to production and operations management as well as investment projects are discussed in the second edition.
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
All books in our catalog are Original.
The book is written in English.
The binding of this edition is Paperback.
✓ Producto agregado correctamente al carro, Ir a Pagar.