Share
Boeing 787-8 Design, Certification, and Manufacturing Systems Review: Boeing 787-8 Critical System Review Team
Federal Aviation Administration (Author)
·
Createspace Independent Publishing Platform
· Paperback
Boeing 787-8 Design, Certification, and Manufacturing Systems Review: Boeing 787-8 Critical System Review Team - Federal Aviation Administration
Choose the list to add your product or create one New List
✓ Product added successfully to the Wishlist.
Go to My Wishlists
Origin: U.S.A.
(Import costs included in the price)
It will be shipped from our warehouse between
Thursday, July 25 and
Thursday, August 01.
You will receive it anywhere in United Kingdom between 1 and 3 business days after shipment.
Synopsis "Boeing 787-8 Design, Certification, and Manufacturing Systems Review: Boeing 787-8 Critical System Review Team"
This final report is in response to the Federal Aviation Administration's (FAA) and Boeing Commercial Airplanes' (Boeing) assignment to validate the work conducted during the Boeing 787 (B787) certification process and further ensure the airplane meets the intended level of safety. On January 31, 2013, the FAA and Boeing jointly formed the B787 Critical Systems Review Team (CSRT) to conduct a comprehensive review of the B787's critical systems, including the airplane's design, manufacture, and assembly, and provide recommendations. From February 1, 2013, to July 31, 2013, the CSRT, composed of FAA and Boeing subject matter experts, conducted in-depth reviews of B787 critical systems based on in-service data and using safety risk management principles. These subject matter experts have backgrounds in both engineering (systems, structures, and propulsion) and manufacturing/quality. The CSRT used in-service and in-production issues to focus its review. To further define the scope of its activities, the CSRT employed a safety-risk methodology to prioritize areas for review.