Share
Construction Scheduling with SureTrak 3.0
Mohamed Hegab
(Author)
·
Khaled Nassar
(Author)
·
Createspace Independent Publishing Platform
· Paperback
Construction Scheduling with SureTrak 3.0 - Hegab, Mohamed ; Nassar, Khaled
Choose the list to add your product or create one New List
✓ Product added successfully to the Wishlist.
Go to My Wishlists
Origin: U.S.A.
(Import costs included in the price)
It will be shipped from our warehouse between
Monday, July 29 and
Monday, August 05.
You will receive it anywhere in United Kingdom between 1 and 3 business days after shipment.
Synopsis "Construction Scheduling with SureTrak 3.0"
The book covers the use of the SureTrak(R) software in easy format by walking through the software in a way similar to the practical use of the software which makes it easy to apply. It has project examples which allow user to grasp the concept and us the software efficiently. SureTrak(R) is planning and scheduling software that is trademarked and owned by Oracle that can be used in any industry including building, construction, oil & gas and software development.
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
All books in our catalog are Original.
The book is written in English.
The binding of this edition is Paperback.
✓ Producto agregado correctamente al carro, Ir a Pagar.