Millions of books in English, Spanish and other languages. Free UK delivery 

menu

0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional
portada Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR 50.54(m)
Type
Physical Book
Language
Inglés
Pages
110
Format
Paperback
Dimensions
28.0 x 21.6 x 0.6 cm
Weight
0.27 kg.
ISBN13
9781500141004

Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR 50.54(m)

Commission, U. S. Nuclear Regulatory (Author) · Createspace Independent Publishing Platform · Paperback

Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR 50.54(m) - Commission, U. S. Nuclear Regulatory

New Book

£ 19.88

  • Condition: New
Origin: U.S.A. (Import costs included in the price)
It will be shipped from our warehouse between Friday, July 19 and Friday, July 26.
You will receive it anywhere in United Kingdom between 1 and 3 business days after shipment.

Synopsis "Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR 50.54(m)"

Regulations set forth by the U.S. Nuclear Regulatory Commission (NRC) prescribe the qualifications and staffing levels for licensed operating personnel for nuclear power plants. The introduction of advanced reactor designs and increased use of advanced automation technologies in existing nuclear power plants will likely change the roles, responsibilities, composition, and size of the crews required to control plant operations. Current regulations regarding control room staffing, which are based upon the concept of operation for existing light-water reactors, may no longer apply. Therefore, applicants for an operating license for an advanced reactor, and current licensees who have implemented significant changes to existing control rooms, may submit applications for exemptions from current staffing regulations. The NRC staff is responsible for reviewing the exemption requests and must determine whether the staffing proposals provide adequate assurance that public health and safety will be maintained at a level that is comparable to that afforded by compliance with the current regulations.

Customers reviews

More customer reviews
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)

Frequently Asked Questions about the Book

All books in our catalog are Original.
The book is written in English.
The binding of this edition is Paperback.

Questions and Answers about the Book

Do you have a question about the book? Login to be able to add your own question.

Opinions about Bookdelivery

More customer reviews