Share
Preliminary Assessment of Chloride Concentrations, Loads, and Yields in Selected Watersheds along the Interstate 95 Corridor, Southeastern Connecticut
U. S. Department Of The Interior (Author)
·
Createspace Independent Publishing Platform
· Paperback
Preliminary Assessment of Chloride Concentrations, Loads, and Yields in Selected Watersheds along the Interstate 95 Corridor, Southeastern Connecticut - U. S. Department of the Interior
Choose the list to add your product or create one New List
✓ Product added successfully to the Wishlist.
Go to My Wishlists
Origin: U.S.A.
(Import costs included in the price)
It will be shipped from our warehouse between
Tuesday, July 16 and
Tuesday, July 23.
You will receive it anywhere in United Kingdom between 1 and 3 business days after shipment.
Synopsis "Preliminary Assessment of Chloride Concentrations, Loads, and Yields in Selected Watersheds along the Interstate 95 Corridor, Southeastern Connecticut"
Water-quality conditions were assessed to evaluate potential effects of road-deicer applications on stream-water quality in four watersheds along Interstate 95 (I-95) in southeastern Connecticut from November 1, 2008, through September 30, 2009. This preliminary study is part of a four-year cooperative study by the U.S. Geological Survey (USGS), the Federal Highway Administration (FHWA), and the Connecticut Department of Transportation (ConnDOT). Streamflow and water quality were studied at four watersheds-Four Mile River, Oil Mill Brook, Stony Brook, and Jordan Brook.